Sign In | Join Free | My polstate.com
China Changzhou Vic-Tech Motor Technology Co., Ltd. logo
Changzhou Vic-Tech Motor Technology Co., Ltd.
Motor Manufacturer,Rreliable Quality, Price Concessions
Verified Supplier

8 Years

Home > Linear Stepper Motor >

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Changzhou Vic-Tech Motor Technology Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Brand Name : VIC-TECH

Model Number : VSM25C-48S-0127-145-01

Certification : RoHS, ISO9001

Place of Origin : China

MOQ : 1Unit

Price : $11~$31/Unit

Payment Terms : Western Union, T/T, L/C, MoneyGram

Supply Ability : 100000 Units/year

Delivery Time : 15-30 work days

Packaging Details : Standard export package in corrugated carton (Mass production).

Motor type : Permanent Magnet Linear stepper motor

Motor diameter : 25 mm

Step angle : 7.5°

Phase current : 160 mA

Phase number : 2 phases (Bipolar)

Coil resistance : 70Ω/phase

Contact Now

VSM25C-48S 25mm Diameter External Drive Long Leadscrew Permanent Magnet Linear Stepper Motor

This is a 25mm diameter linear stepper motor equipped with an extra-long 145mm leadscrew. The leadscrew length is adjustable.

Since the leadscrew lead determines the motor's linear speed and thrust, a longer lead results in a higher linear speed but lower linear thrust/force.

We offer two different step angles: 7.5°/step and 15°/step.

Higher rated voltage results in higher motor coil resistance, which depends on the customer's power supply and driver parameters.

Customers can select all parameters according to their needs.

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Typical applications:

* Medical Equipment

* Linear Robotic Control

* Precision Calibration

* High Precision Valve

* Other Precise Position Movement

Plus tt has extra low noise and high stability.

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Design Layout (Unit:mm)

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Parameter sheet:

Motor type Linear stepper motor
Motor diameter 25mm
Rated voltage 12V DC
Phase current 160mA
Phase resistance 70Ω/phase
Phase inductance 65 mH/phase
Step angle 7.5°
Screw lead 0.6096mm (customizable)
Step length 0.0127mm/step
Leads crew length 145 mm (customizable)
Phase No. 2 phases
Driving method 2-2 excitation

Competitive Advantage

  • High quality and the best price.

  • Fast deliver,storage company and rich inventory

  • Near Shanghai port, the traffic is very convenient.

Product Detail Presentation

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter


Product Tags:

long lead screw linear stepper motor

      

permanent magnet linear stepper motor

      

25mm diameter linear stepper motor

      
Wholesale VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter from china suppliers

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Changzhou Vic-Tech Motor Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)